The interest in solar technology has spiked among environmentally conscious consumers world-wide. In the United States, more than a million homes have already utilized solar power with many more adopters, including those operating in the commercial space, now considering solar panel installation. There are however a number of steps that need to be taken to ensure that going solar isn’t met with any unnecessary headaches.
Before obtaining the required permits and documentation as well as ordering the right equipment, it’s important that the roof of the building is structurally secure and that the electrical panel is inspected to determine if it needs to be upgraded to work with solar. A company in Flushing, Queens interested in solar installation was visited by Absolute Electric, and it was discovered that their electrical panel needed to be upgraded before a solar company could perform a proper installation.
The reason for the upgrade is due to the solar panels requiring more amps of current and as such the ampere capacity of the client’s electrical box needed to increase to handle the extra power. When necessary, a panel upgrade is absolutely crucial for any solar panel installation and without that adjustment, reaping the benefits of going solar would not be possible.
At Absolute Electrical Service, No Job Is Too Small and Emergency Service is available. Contact us today for a free electrical estimate.
A commercial panel upgrade replaces an undersized or outdated service and distribution setup with equipment rated for current loads and future growth, including solar readiness. Businesses outgrow their panels when they add HVAC, kitchen equipment, EV chargers, or server rooms, or when a building shifts to a more power-hungry tenant. Common signs include a full panel with no spare breaker slots, frequent tripping, warm panel covers, fuse-based or obsolete gear, and a service size that can't support planned additions. For properties considering rooftop or carport solar, the existing service often needs upgrading first to handle backfeed safely and meet interconnection rules.
Done properly, an upgrade starts with a load calculation and a look at where the business is headed, so the new service and panelboard are sized with real headroom rather than just meeting today's minimum. Solar-ready work means provisioning the right busbar rating, a correctly sized main breaker, and space for a backfeed breaker or line-side tap that satisfies the 120-percent rule and your utility's interconnection requirements. Three-phase services are checked for balance across the new distribution. The whole upgrade is filed under permit, coordinated with the utility for any service change, and staged to keep the business powered, with the final cutover scheduled for the least disruptive window.
A panel upgrade usually opens the door to related improvements, so these links connect to the work it enables: full or partial rewiring, dedicated circuits for new equipment, EV charging infrastructure, surge protection, and standby generators. The place links show the Long Island areas we serve across Nassau and Suffolk, where commercial roofs and parking structures are increasingly being prepped for solar.
[wpbr_collection id="76"]
Phone: 718-229-9300
Address: 224-08 Linden Blvd., Cambria Heights, NY 11411
Phone: 516-520-4700
Address: 2938 Hempstead Turnpike, Levittown, NY 11756
Phone: 631-567-1500
Address: 1115 Smithtown Avenue, Bohemia, NY 11716